• 0 Posts
  • 11 Comments
Joined 1 year ago
cake
Cake day: September 24th, 2023

help-circle

  • Seriously. We are talking about tire tread compared to weight. Both use multiple sizes of tire depending on the year/model. There are a few that overlap in diameter to get the closest to comparison but they still have a very different width. We are talking about a 235/35R18 vs a 235/75R18. That is a huge difference in wall height/aspect ratio and changes how the tire gives under power. Those numbers massively change depending on model as well. Something like an f150 raptor could have a 315/70R17, almost a foot wide. So comparing just the weight and saying they are close enough is far from a fair comparison.


  • You are on a nuke loving platform and people are going to downvote anything that isn’t hard pro nuke. But you are correct. I have had this exact same discussion before. The numbers you are looking for are called the LCOE, or the ‘levelized cost of electricity’ where the lifetime of the technology cost if factored in. Offshore wind is currently the lowest followed by solar. Nuke is clost to 10x the cost. There is even an international nuke consortium that has several reports agreeing with exactly what you are saying and basically sum it up as: if you invested in nuke early, then it is cost efficient to just keep upgrading. If you didn’t invest in it early, then the cost to implement it so high that you are better off going wind/solar. Even if you add in the cost of battery systems, it is still cheaper than building a new nuke plant. And more than that, with these new nuke plants you have to upgrade all your infrastructure because your old wires can’t handle the output loads. If you look at the 30+ billion Georgia spent on this plant, they could have simply given out a micro generation grant to everyone to add solar to their roofs, not needed to upgrade the lines, and been far better off. But hey, just like reddit, if you are commenting on lemmy you better be pro nuke only and ignore the other numbers.



  • I agree with you as a realist on the situation. We will never stop manufacturing them, at least for the foreseeable future. But we forget that something like recycling is the last stage of the 3R’s to follow. We must first look to reduce consumption. We need to find alternatives where possible, and switch away from these forever chemicals anywhere we can. Next, while “reusing” is not the best term here, but we need to find ways to extend the life of the products that we are forced to use and try to use them up in every way we can. Then lastly we need to be recycling it as best as possible before we send it to an incinerator, or more realistically a developing nation landfill.

    Reduce -> Reuse -> Recycle is listed that way for a reason. Everyone always just jumps to the final stage then argue about how bad the recycling is while not even considering ways to reduce or reuse throughout the entire process.


  • 600$

    To employ someone at 10$/hr, their actual cost is probably close to 15$/hr when you factor I them coming in to work in the office and all the costs associated with that. At 15$/hr it takes 40 hrs to cost 600$ to thr company. That is one week of work for one employee. This means that they could have a 600$ fuck up every week and still break even over hiring a person. And we are talking about just one person. Chat support is nor.ally contracted out as entire teams and departments.





  • Unlike the othe comment, this DOES sound like it could be BPPV, where something like the epley maneuver would work. Typically we would use the Semont-plus maneuver (same idea, slightly different). Or there is a fun half somersault maneuver the person could try on their own.

    Bppv will be brief but intense episodes lasting seconds with lasting nausea for minutes and exasterbated by head movements. You will also see their eyes jumping or flicking (nystagmus).


  • The epley maneuver is to treat BPPV- where an otolith becomes dislodged and then finds its way into a semicircular canal (normally the latteral canal). If it was causing vertigo it would have to be the posterior canal. Not to say it isn’t possible, but it is the statistically least common canal to happen in. Not only that, but the epley wouldn’t treat it. Even then, this strongly doesn’t sound like BPPV, whose episodes would last seconds to minutes. If the episodes are lasting minutes to hours it is a short list of other possible things. best case this is vestibular migraine of it was vestibular related. More likely this is central involve ment and the person needs to see a neurologist. I have seen patients like this before for balance accessments. We will do the testing on them(VNG and caloric testing), but then have to tell them to go to a different department because it isn’t part of the vestibular system causing the problem. I would push to see an ENT/neuro/PCP sooner than later because worst case is it is a developing vestibular schwanoma (non cancerous tumor) and the sooner the better to take care of it or at least monitor it.